电缆标记桩施工要注意什么 ?

来源:/ 宣布时间:日期:2023-11-27 0
1、电缆标记桩应装置在管道的正上方 ,当电缆标记桩用作转角桩时 ,应装置在转角段中点的正上方。当管道正上方没有装置条件时 ,可设置在相对距离教近的路边绿化带内 ,并在电缆标记桩上标明管桩适意图。
1. Cable marker piles should be installed directly above the pipeline. When used as corner piles, cable marker piles should be installed directly above the midpoint of the corner section. When there are no installation conditions above the pipeline, it can be set up in the roadside green belt that is relatively close to the pipeline, and the suitability diagram of the pipeline pile can be indicated on the cable marker pile.
2、全关闭禁入门路不得设置电缆标记桩。电缆标记桩的装置间距宜为100m。地面平坦、视碍少、管门路由顺直的情况 ,电缆标记桩的装置间距可大100m。特殊地段 ,具体铺设规范制度进行管道标记桩的铺设!
2. Cable markers shall not be installed on fully enclosed and restricted roads. The installation spacing of cable marker posts should be 100m. When the ground is flat, there are few visible obstacles, and the pipeline routing is smooth, the installation spacing of cable marker piles can be increased by 100m. In special areas, the specific laying standards and regulations shall be followed for the laying of pipeline marker piles!
3、电缆标记桩是埋设在天然气高压管线沿线以塑钢、玻璃钢、复合材质为主 ,涂有黄色标记的电缆走向标记桩 ,为起提示警示作用 ,标有“燃气管道、燃气电话、管线桩号、管线走向、电子巡检信息钮” ,便于巡线抢修人员迅速找准管线位置 ,赢得抢修时机。凭据《城镇燃气治理条例》第三十六条要求 ,擅自拆除和移动天然气高压管线上埋设的电缆标记桩属于违法行为。
3. Cable marker stakes are mainly made of plastic steel, fiberglass, and composite materials buried along natural gas high-pressure pipelines. They are painted with yellow markings and are marked with "gas pipeline, gas telephone, pipeline pile number, pipeline direction, and electronic inspection information button" to serve as a warning. This facilitates line patrol and repair personnel to quickly locate the pipeline position and win the opportunity for repair. According to Article 36 of the Urban Gas Management Regulations, it is illegal to dismantle and move cable markers buried on high-pressure natural gas pipelines without authorization.
电缆标记桩施工注意事项
Construction precautions for cable marker piles
“七大”办法流程:准备的事情——相关仪器的检查和矫正——进行丈量放线——牢固交桩——计划线路——调解交桩——完工后需要纪录相关信息。
The process of the "Seven Major" steps: preparation work - inspection and correction of relevant instruments - measurement and setting out - fixing of stakes - planning of routes - adjustment of stakes - recording of relevant information after completion.
电缆警示桩
准备事情重要:
Preparation work is important:
1、详细检察研究放线区域的完整的施事情业图纸。
1. Detailed review of the complete construction operation drawings for the research and layout area.
2、提前准备交桩纪录需要的表格及了解接桩组成人员便于相同。
2. Prepare the necessary forms for pile handover records in advance and understand the personnel responsible for pile handover for easy communication.
3、准备切合要求的丈量仪器、木桩、标笔、白石灰以及其他工具。
3. Prepare measuring instruments, wooden stakes, markers, lime, and other tools that meet the requirements.
4、将需要丈量放线使用的工具进行矫正 ,还需要包管这些工具必须在划定的有效期规模之内。
4. Correct the tools used for measuring and setting out, and ensure that these tools are within the specified validity period.
标记桩在操作方面需要注意:
Attention should be paid to the operation of marker posts:
1、丈量放线的基准点一定要接纳GPS定位 ,其中放线基准点是指设计控制桩和水准基桩。
1. The benchmark for measuring and setting out must be determined using GPS positioning, where the benchmark for setting out refers to the design control piles and leveling foundation piles.
2、一定要凭据图纸的作业要求设置控制桩 ,一定要标明桩号、里程、地面标高、转角高度等数据。
2. It is necessary to set up control piles according to the requirements of the drawings, and indicate data such as pile number, mileage, ground elevation, and corner height.
3、在定测资料宁静面或是断面图纸上标明地下的障碍物 ,其次是 ,要包管线路和地下构筑物交叉两侧的控制规模为3米 ,同时 ,必须要设置警告牌和标记桩。标记桩上必须要写上相关的数据。好比:埋深 ,交叉尺寸等。
3. Indicate underground obstacles on location survey data and plan or section drawings. Secondly, ensure that the control range on both sides of the intersection of the line and underground structures is 3 meters. At the same time, warning signs and marker stakes must be set up. Relevant data must be written on the marker post. For example: burial depth, crossing size, etc.
4、关于划线方面 ,要凭据轴线和标记桩的界限之间拉一根绳子 ,撒上白石灰划线。完成划线 ,要清理现场的障碍物。
4. Regarding the marking, a rope should be pulled between the axis and the boundary of the marker post, and white lime should be sprinkled to mark the line. Complete the marking and clear any obstacles on site.
5、关于移桩方面 ,是在划线完成之后扫除清理之前 ,将所有需要的线管桩平移到土堆的旁边 ,规模控制在0.3m。
5. Regarding pile relocation, it is necessary to move all required line pipe piles to the side of the soil pile after completing the marking and before cleaning, with a range controlled at 0.3m.
有了电缆警示桩上面的小总结 ,希望对宽大客户有所资助 ,如果有什么不睬解的或者寻求资助的请点击我们的网站:或者来电咨询 ,我们会尽全力为您
With the summary above the cable warning post, we hope it can be helpful to our customers. If you have any questions or need help, please click on our website: Or call to inquire, we will do our best to solve it for you